QuickMenu Save Document
Ardenham Energy Ltd
Ardenham Court
Oxford Road
Aylesbury
Bucks HP19 8HT
Tel:  01296 331362
Fax: 01296 435747

Public Sector Pricelist

Solar thermal and solar PV, West London Crown House Southfield School

Technical Specification
Price Information
Return on Investment
CO2 Saving
Technology
Footprint
Usable Free
Energy Yield
kWh/Yr
Gross cost Ex
VAT
Less LCBP Grant
Net Cost to
purchaser
Annual Cost
Saving
Annual Value
of ROCs
Annual
Return on investment
Annual CO2
Saving (KG)
Equivalent
return flight to
Equivalent
to Driving (miles)

Solar PV
3kWp Polycrystalline
12 m2 SE/SW
2,550
£15,309
£7,655
£7,655
£233
£211.62
5.9%
1,450
Jeddah
4,055
5kWp Polycrystalline
20 m2 SE/SW
4,250
£24,300
£12,150
£12,150
£389
£369.36
6.2%
2,414
Vancouver
6,758
10kWp Polycrystaline
40 m2 SE/SW
8,500
£46,656
£23,328
£23,328
£778
£738.72
6.5%
5,680
Honolulu
13,515

Wind
2.5 kW Ground mounted
24 m2
3,500
£16,000
£8,000
£8,000
£1,600
£332.50
5%
1,988
Barbados
6,083
6 kW Ground mounted
24 m2
9,500
£24,000
£12,000
£12,000
£2,400
£902.50
8%
5,396
Fiji
16,512

Solar Hot Water
2 Collector Flat Plate
4 m2 south facing
1200
£3,900
£1,950
£1,950
£120
n/a
9%
233
Copenhagen
777
3 Collector Flat Plate
6 m2 south facing
1800
£5,760
£2,880
£2,880
£180
n/a
8%
350
Rome
1,165
3 Collector Evacuated Tube
4 m2 south facing
1500
£5,162
£2,581
£2,581
£150
n/a
12%
350
Rome
1,165

Ground Source Heat Pump
6kW
100m2 for ground loops
75%
£8,000
£4,000
£6,800
£618
n/a
9%
379
Seville
1,263
8kW
150m2 for ground loops
75%
£10,500
£5,250
£9,300
£845
n/a
9%
518
St Petersburg
1,728
10kW
200m2 for ground loops
75%
£13,000
£6,500
£11,800
£1,073
n/a
9%
658
Instanbul
2,192

Air Source Heat Pump
6kW
2m2 external
70%
£6,500
0
£6,800
£618
n/a
9%
379
Seville
1,263
8kW
2m2 external
70%
£8,000
0
£9,300
£845
n/a
9%
518
St
Petersburg
1,728
10kW
2m2 external
70%
£9,000
0
£9,000
£1,073
n/a
9%
658
Instanbul
2,192

Biomass Boiler
6kW
10m2 boiler room
100%
£8,000
0
£6,800
£618
n/a
9%
379
Seville
1,263
8kW
10m2 boiler room
100%
£10,500
0
£9,300
£845
n/a
9%
518
St
Petersburg
1,728
10kW
10m2 boiler room
100%
£11,000
0
£11,800
£350
n/a
9%
658
Instanbul
2,192

Notes:
Energy yields assume a good location for solar i.e. south facing with minimal obstruction,
and for wind, exposed area with no tall trees or buildings with an average or above UK wind speed (5m/s).

Annual cost saving is based on a typical residential electricity and gas prices. These may change in future,
and have not anticipated potential feed in tariffs which will significantly reduce payback on investment.

Depending on electricity supplier/purchaser any electricity produced over 500 kWh PA may be eligible for a Renewable Obligation Certificate (ROC). This is valued at around £46 for every 1000 kWh produced (rounded up from 501 kWh).

Bespoke solutions incorporating solar roof tiles and in roof systems can be provided. The prices here do not provide this.

Carbon saving figures based on standard car achieving 35mpg.


PUBLIC SECTOR, SCHOOLS & COMMUNITIES
Ardenham Energy Ltd is a British Gas consortium partner for PV and Wind, and can provide installations at
agreed framework prices under the low carbon buildings programme phase 2 .

ROCs are based on March 2009 levels.