The  table below details our guideline pricing structure for an MCS compliant installation.  

updated_table_of_domestic_pricing_2


Notes:

Prices assume Amerisolar mono-crystalline panels and string inverter.
Prices are based on residential VAT rates of 5%.
Prices include a sum for a basic scaffolding deck as part of installation, this is subject to survey.
Generally It is assumed 50% of energy is exported and 50% used on site. This is an assumption, and may vary in reality.
The equipment and installation must be undertaken by a certified manufacturer/installer. Ardenham Energy holds MCS certification, and uses MCS approved technology
Solar PV Energy yields assume a good location for solar i.e. south facing with minimal obstruction and 30 degree off horizontal pitch.
Solar PV Generation base line is 850 kWh/kWp optimal generation, which is adjusted to take into account shading, orientation and angle in the calculation. In parts of southern and western England this may be exceeded
Annual cost saving is based on typical residential electricity and gas prices. These may change in future, 
Bespoke solutions incorporating solar roof tiles and in roof systems can be provided. The prices here do not provide this.
Carbon saving figures based on standard car achieving 35mpg. 
Ardenham Energy are not IFAs
The outputs assume that the grid voltage is always within tolerance.
For installations above 3.7 kWp the Network Operator reserves the right to ask for additional protection equipment and witness test the commissioning. This may add additional cost.


The following table outlines the typical variance from optimal 30 degrees south facing. This percentages should be used to  estimate outputs on non ideal orientations, as a multiple of the outputs outlined above. It is unlikely we would recommend  undertaking a project with orientations further north than due east or west.


solar performance