2011

aldington
 Aldington Primary School, Kent County Council 10 kWp PV Array  | Download the PDF

In February 2011, Ardenham Energy installed a 10 kWp system for Aldington Primary School near Ashford in Kent. This was one of the last Low Carbon Building Programme projects.

2010

   

photo_001


Matthew Arnold School, Oxford County Council / Low Carbon West Oxford
100 kWp PV Array (G59) | Download the PDF

In April 2010, Ardenham Energy installed a 100 kWp system for Low Carbon West Oxford on the roofs of the main and science block of the Matthew Arnold School in Botley, Oxford.

IMG_9803_000


St Marys School, Barnet
5.2 kWp PV Array | Download the PDF

In April 2010, Ardenham Energy installed a 5.76 kWp system for the St Mary’s Church of England School in Barnet. The electrical and mechanical installation was completed in 3 days.


IMG_9787


Wolsey Junior School, Croydon Council
6 kWp PV Array | Download the PDF

In April 2010, Ardenham Energy installed and commissioned a 6.5 kWp system for the Wolsey Junior School in Croydon. The electrical and mechanical installation was completed in 3 days.



eyc_opt

Thornton Heath Early Years Centre, Croydon, Surrey
8.5 kWp PV Array | Download the PDF

In Spring Half Term 2010, Ardenham Energy completed the installation of a 8.5 kWp system for the Thornton Heath Early Years Centre in Croydon.

IMG_8827_001


Berger Primary School Newbuild
25 kWp PV Array (G59) | Download the PDF

In Early 2010, Ardenham Energy completed the installation of a 25 kWp system for the new Berger Primary School in Homerton, in the London Borough of Hackney.



img_0054

Bankside Primary School, Leeds
10kWp PV and 4 Collector Solar Thermal Array

In Autumn 2010, Ardenham Energy completed the installation of a 10 kWp system for the new Bankside Primary School in Leeds

 

 


025

Linslade Lower School, Leighton Buzzard
5kWp PV and 4 Collector Solar Thermal Array

190

Heavers Farm Primary School, Croydon Council
7 kWp PV Array

whitehorse_opt

Whitehorse Manor School, Croydon Council
6 kwp PV Array

treorchy_opt

Treorchy Comprehensive School, RCT
10 kWp PV Array

2009

   
howard

Howard Primary School, Croydon Council
7.2 kWp PV Array | Download the PDF

In December 2009 / January 2010 Ardenham Energy installed and commissioned a 7.2 kWp system for the Howard Primary School in Croydon. Up against terrible weather the electrical and mechanical installation was completed in 3 days.


GM


Great Missenden C of E Primary School, Buckinghamshire County Council
6.8 kWp PV Array | Download the PDF

The Combined 6.8 kWp Solar Electric PV systems were installed and commissioned by Ardenham Energy at Great Missenden C of E Primary School in Great Missenden, Buckinghamshire. The Solar Electric system along with an Air Source Heat Pump to heat the pool will make the school an exemplary example of what can be achieved by innovative retrofit of sustainable technology.

whitings

Whitings Hill Primary School, Barnet, London Borough of Barnet
1.8 kWp Solar PV, 2.5 kWp Wind Turbine and Solar Thermal System
mascalsturbine_000

Mascalls School, Paddock Wood, Kent County Council
2.5 kW Wind Turbine | Download the PDF

The Proven 2.5 kW ground mounted, grid connected wind turbine system has been installed and commissioned by Ardenham Energy in August 2009 in the school grounds of Mascalls School in Kent. The turbine will benefit from a good wind regime will generate approximately 3000 kWh of electricity per annum.



folkestone_000

All Souls C of E Primary School, Folkstone, Kent County Council
10.2 kWp PV Array | Download the PDF

Installed and commissioned by Ardenham Energy Ltd on the roofs of the All Souls C of E Primary School in Folkestone, in June 2009. The project was funded by a combination of school and and a Low Carbon Building Programme phase 2 grant award.

eastchurchturbine_000


Eastchurch C of E Primary School, Isle of Sheppey, Kent County Council
6 kW Wind Turbine | Download the PDF

The Proven 6kW ground mounted grid connected wind turbine system has been installed and commissioned by Ardenham Energy in May 2009 at the Eastchurch Primary School in Sheerness, Kent. The site located close to the Thames estuary will benefit from a good wind regime and complements the Solar PV and Solar Hot Water systems already in situ within the building.

overstone


Overstone Combined School, Wing, Buckinghamshire County Council
8.6 kWp Solar Electricity Installation | Download the PDF

The grid connected solar arrays were installed and commissioned by Ardenham Energy Ltd on the South East and South West facing roofs of Overstone Combined School, in Wing near Aylesbury. Planning permission was secured from Aylesbury Vale District Council.

eastchurch_pv_opt


Eastchurch C of E Primary School, Kent County Council
4.4 kWp Solar Electricity Array, Isle of Sheppey, Kent | Download the PDF

The grid connected solar array systems was installed by Ardenham Energy Ltd at the Eastchurch Prmary School on the Isle of Sheppey in Kent. The array supplemented a 3 kWp already in situ at the school.


st_nicholas_opt


St Nicholas C of E School, New Romney, Kent County Council
7.82 kWp Solar Electricity Installation | Download the PDF

The grid connected roof mounted PV as been installed and commissioned by Ardenham Energy Ltd in 3 days on the recently refurbished roof of the school. The project was funded by the Low Carbon Buildings Programme, Kent County Council and NPower Renewables. Ardenham Energy as part of the British Gas Consortium undertook the installation in March 2009.

st_michaels_opt


St Michaels C of E Primary School, Highgate
4.1 kWp Solar Electrcity Installation | Download the PDF

The grid connected roof mounted PV as been installed and commissioned by Ardenham Energy Ltd in 2 days on the recently refurbished roof of the school. The project was part funded by the Low Carbon Buildings Programme. Ardenham Energy as part of the British Gas Consortium undertook the installation in March 2009.

2008

   

greenfield_opt


Greenfield C of E Lower School, Central Bedfordshire Council
8.84 kWp Solar Electricity Installation | Download the PDF

The grid connected solar arrays were installed and commissioned by Ardenham Energy Ltd on the roofs of the Greenfields C of E Primary School in Greenfields, Bedfordshire over the February half term 2008.

faringdon_opt


Faringdon Junior School, Oxfordshire County Council
10.4 kWp Solar Electricity Installation | Download the PDF

The grid connected solar arrays were installed and commissioned by Ardenham Energy Ltd on the roofs of the Faringdon Junior School in Oxfordshire over the February half term 2008.


st_leomards


St Leonards VA School, Heath & Reach, Central Bedfordshire Council
10.2 kWp PV Array
| Download the PDF

The 3 Phase grid connected roof mounted PV has been installed and commissioned by Ardenham Energy Ltd on the roof of St Leonards VA Lower School in Heath & Reach Bedfordshire. The project was supported by the Big Lottery funded Community Sustainable Energy Programme, EdF Green Energy Fund Low Carbon Buildings Programme and PTA. Ardenham Energy undertook the installation in December 2008.

brookfields


Brookfields School, Tilehurst, Reading, West Berkshire Council
1.8 kWp Solar Electricity Installation | Download the PDF

The grid connected roof mounted PV has been installed and commissioned by Ardenham Energy Ltd on the Brookfield’s School, in Tilehurst near Reading. The installation was undertaken following the award of a Low Carbon Building Programme Phase 2 Grant, and planning approval by West Berkshire Council in autumn 2008.

yerbury


Yerbury School, London Borough of Islington
14.6 kWp PV Array (G59) | Download the PDF

In the Autumn/Winter of 2008, Ardenham Energy installed and commissioned a 86 no 170Wp PV module based system on the South East and South West Facing roof of Yerbury Primary School in Islington. The project was supported by Islington Council Climate Change Fund and funding as part of the Governments Low Carbon Building Programme phase 2.

mary_bassett


Mary Bassett School, Leighton Buzzard, Central Bedfordshire Council
8.6 kWp PV Array | Download the PDF

The grid connected roof mounted PV has been installed and commissioned by Ardenham Energy Ltd on the roof of The Mary Bassett School in the centre of Leighton Buzzard. The project was supported by the Lottery funded Community Sustainable Energy Programme, Low Carbon Buildings Programme and PTA.

st_christopher

St Christopher’s School, Lincolnshire County Council
3 kWp Solar Electricity Array | Download the PDF

The grid connected roof mounted PV has been installed and commissioned on the roof of the gymnasium of the school by Ardenham Energy Ltd in 2 days. The project was funded by the Low Carbon Buildings Programme. Ardenham Energy undertook the installation in September 2008.

southfields


Southfields School, Wokingham Borough Council
4.2kWp PV Array | Download the PDF

The grid connected roof mounted PV has been installed and commissioned by Ardenham Energy Ltd on the gymnasium roof of the Southfields Special School in Wokingham. This is as part of the British Gas Low Carbon Buildings Programme framework funded by BERR. The installation was undertaken following the award of a Low Carbon Building Programme Phase 2 Grant, and planning approval by Wokingham Borough Council in February 2008.

claremont


Claremont School, Tunbridge Wells, Kent County Council
6.68 kWp PV Array | Download the PDF

In May 2008 Ardenham Energy installed and commissioned the 6.68 flat roof mounted grid tied PV system on the gymnasium roof of the Claremont Primary School in Tunbridge Wells. The project was funded by the Kent County Council Renewable Energy Fund, Low Carbon Building Phase1 grant and from an Eon Source grant.

2007

   

hawthorns


Hawthorns School, Wokingham Borough Council, Berkshire
2 kWp PV Array | Download the PDF

The grid connected roof mounted PV has been installed and commissioned by Ardenham Energy Ltd on the Hawthorns School in Wokingham after development work by TV Energy and Wokingham Borough Council. The installation was undertaken following the award of a Low Carbon Building Programme Phase 1 Grant, and planning approval by Wokingham Borough Council in September 2007.