2011

SurreyUniversity

University of Surrey, Guildford.
10 kWp Solar Electricity Array | Download the PDF

In July 2011, Ardenham Energy Ltd installed and commissioned a 10 kWp grid connected solar PV array on the roof of the Learning Resource Centre at the University of Surrey in Guildford.

 

Vale-House Vale of Aylesbury Housing Trust, Aylesbury, Bucks.
50 kWp Solar Electricity Array | Download the PDF

In June 2011 Ardenham Energy installed and commissioned a 50 kWp PV system for the Vale of Aylesbury Housing Trust in Aylesbury.
South-Bucks-small South Bucks District Council,  Denham, Buckinghamshire.
10 kWp Solar Electricity Array | Download the PDF

In June 2011 Ardenham Energy installed and commissioned a 10 kWp PV system on the roof of the South Bucks District Council building in Denham in Buckinghamshire.

2010


 
Dorchester Dorchester Sailing Club,  Oxfordshire.
4 kWp Solar Electricity Array | Download the PDF

In November 2010 Ardenham Energy installed and commissioned a 4 kWp system on the roof of the clubhouse at Dorchester Sailing Club in Oxfordshire.

Cherwell-thumb

 


Cherwell District Council depot, Banbury, Oxfordshire.
14 kWp Solar Electricity Array | Download the PDF

In July 2010 Ardenham Energy installed and commissioned a 14.0 kWp system on the roof of a new depot for Cherwell District Council in Banbury.

stjames_000


St James United Reform Church, Buckhurst Hill, Essex
20 kWp Solar Electricity Array (G59) | Download the PDF

In Jan 2010 Ardenham Energy installed and commissioned a 20.4 kWp system for the St James United Reform Church in Essex. The electricity generated is synchronised with the grid supply via 4 SMA Inverters and will be used to supply clean energy to the Church, as well as exporting to the grid for use elsewhere when there is more excess energy.

treorchy_library_opt


Treorchy Library RCT Council
8 kWp PV Array  

In the Summer of 2010, this 3 phase connected PV array was designed, installed and commissioned  byArdenham Energy on flat roof at the man Treorchy Library. The installation took 4 days, and included a display for educational purposes.

 


welsh_opt


RCT Council Rhydywaun Education Centre
14kWp PV Array  ( G59)

In the Summer of 2010, this 3 phase connected PV array was designed, installed and commissioned  by Ardenham Energy on a metal roof system. The installation took 5 days, and included a display for educational purposes.

2009


 

Chippy-Lido


Chipping Norton Lido, Oxfordshire
10.2 kWp Solar Electricity Array | Download the PDF

In June 2009 Ardenham Energy installed and commissioned a 10.2 kWp system for the Chipping Norton Lido in Oxfordshire. The electrical and mechanical installation was completed in 3 days and will complement the flat plate solar hot water system already installed.

 

City-University

City University, London
30 kWp Solar Electricity Array (G59) | Download the PDF

The 30 kWp installed solar array has been designed, installed and commissioned by Ardenham Energy Ltd on the roofs of the Tait Building (Engineering Faculty) of the City University in London in May 2009. The arrays comprising of 172 Sharp 170Wp PV Panels on the flat roof. The project was funded by a combination of the University, Low Carbon Building Programme phase 2, and a CSEP National Lottery grant award.

 

RSPBTurbine_000


RSPB, Rainham Marshes
15 kW Wind Turbine (G59 Wind & Existing PV) | Download the PDF

The Proven 15kW ground mounted grid connected wind turbine system has been installed and commissioned by Ardenham Energy in March/April 2009. It was installed at the entrance to the RSPB Reserve in Rainham Mashes near Purfleet in Essex, after planning permission was granted by the London Borough of Havering.

 

Northmoor2


Northmoor Trust, Oxfordshire
11.2 kWp Solar Electricity Array | Download the PDF

The grid connected solar arrays were installed and commissioned by Ardenham Energy Ltd on the cafe and adjoining fields of the Northmoor Trust in Little Wittenham in Oxfordshire.

 

2008


 

west_berks


Newbury, West Berkshire Council
11.2 kWp Solar Electricity Array | Download the PDF

The grid connected roof mounted PV has been installed and commissioned by Ardenham Energy Ltd on the roof of West Berkshire Councils Head office in Market Street in Newbury.

 

tindal


Tindlemanor, Old Street, London
5 kWp Solar Electricity Array | Download the PDF

The grid connected roof mounted PV has been installed and commissioned by Ardenham Energy Ltd on the roof of the Tindal Manor office in Islington in September 2008. The project was funded by the Islington Climate Change fund and the Low Carbon Buildings Programme framework funded by BERR and Ardenham Energy as part of the British Gas Consortium.

 

central_library


Islington Central Library, London
6.6 kWp Solar Electricity Array | Download the PDF

The grid connected roof mounted PV has been installed and commissioned by Ardenham Energy Ltd on the roof of the Central Library in Islington, owned by the London Borough of Islington. The project was funded by the Islington Climate Change fund and the Low Carbon Buildings Programme framework funded by BERR and Ardenham Energy as part of the British Gas Consortium. The installation took place in August 2008.

 

minehead


Land Based Skills Centre, Minehead, Somerset
10 kWp Solar Electricity Array | Download the PDF

In the Summer/Autumn of 2008 Ardenham Energy installed and commissioned a 60 162Wp PV module based system on the concrete roof of the Land Based Skills Centre, part of West Somerset College. The project secured 50% funding as part of the Governments Low Carbon Building Programme phase 2.

 

atc


Aylesbury Town Council, Aylesbury, Buckinghamshire
10 kWp Solar Electricity Array | Download the PDF

The grid connected roof mounted PV has been installed and commissioned by Ardenham Energy Ltd on the roof of the Aylesbury Town Council Building in the Centre of Aylesbury. The project was supported by the Low Carbon Buildings Programme framework funded by BERR, and Ardenham Energy as part of the British Gas Consortium.

 

factory


Factory Community Centre, Islington
7 kWp Solar Electricity Array | Download the PDF

The grid connected roof mounted PV as been installed and commissioned by Ardenham Energy Ltd in April 2008 on the roof of the recently refurbished Factory Community Centre in Islington. The project was supported by the Islington Council Climate Change Fund and the Low Carbon Buildings Programme framework. It was funded by BERR and Ardenham Energy as part of the British Gas Consortium.

 

farming


Viking Centre, Claxby, Lincolnshire
3 kWp Aolar Electricity Array | Download the PDF

The 3 kWp grid connected PV array was commissioned in the Spring of 2008 at the Viking Centre in Claxby, Lincolnshire. The project was supported by the Low Carbon Buildings Programme framework funded by BERR, and Ardenham Energy as part of the British Gas Consortium.

2007


 



wocc


Oxford City Council, Oxford
5 kW Solar PV Array | Download the PDF

The grid connected roof mounted PV Array has been installed and commissioned by Ardenham Energy Ltd at the West Oxford Community Centre on the Botley Road in Oxford. The installation was undertaken following the award of a Low Carbon Building Programme Phase 1 Grant, and planning approval by Oxford City Council in April 2007.