Oundle, Cambridgeshire 3.7kWp PV array | Download the PDF In May 2011, a grid connected 3.7 kWp solar electric array was installed and commssioned in Oundle, near Peterborough in Cambridgeshire by Ardenham Energy Ltd on this residential property... |
||||||
![]() |
Fetcham, Surrey. 3.5kWp PV array | Download the PDF In April 2011, Ardenham Energy installed a 3.5kWp solar PV array using Enecsys micro-inverters and Sanyo 240Wp modules on the roof of this property in Fetcham in Surrey.... |
||||||
![]() |
Upton, Buckinghamshire 2.4kWp PV array | Download the PDF In April 2011, Ardenham Energy installed a 2.4kWp, grid-connected solar PV array on the roof of this domestic property in Upton, near Aylesbury in Buckinghamshire... |
||||||
![]() |
Walton Hall, Milton Keynes 3.9kWp PV array | Download the PDF In January 2011, a grid connected 3.89 kWp solar electric array was installed and commssioned in the Walton Hall area of Milton Keynes by Ardenham Energy Ltd on this residential property... |
||||||
![]() |
Ashtead, Surrey 5.5kWp PV array (G59/2) | Download the PDF In January 2011, a grid connected 5.55 kWp solar electric array was installed and commssioned in Ashtead by Ardenham Energy Ltd on this residential property. The project is unusual as the local utility sought additional network protection and a G59/2 relay was included... |
||||||
![]() |
Stokes End, Haddenham In August 2011, Ardenham Energy Ltd installed and commissioned a 2.28kWp grid connected solar PV array on a domestic property in Stokes End, Haddenham. |
||||||
![]() |
Ruislip, Greater London In November 2011, Ardenham Energy Ltd installed and commissioned a 3.8kWp grid connected solar PV array at Ruislip, Greater London. |
||||||
|
|
|||||||
2010 |
|
||||||
|
|
Blewbury, Oxfordshire 2.4 kWp in roof PV array | Download the PDF In Spring 2010, a grid connected 2.6 kWp “In Roof” solar electric array and a 2 Collector Solar Thermal system was installed and commissioned by Ardenham Energy Ltd on a property in Blewbury, Oxfordshire as part of an overall refurbishment. |
||||||
|
|
Grove, Oxfordshire |
||||||
|
|
Heath & Reach, Bedfordshire In January 2010, a grid connected 2.16 kWp roof mounted, solar electric array was installed and commissioned by Ardenham Energy Ltd on a cottage in Heath and Reach near Leighton Buzzard in Bedfordshire. The installation was undertaken following the award of a Low Carbon Building Programme Grant. |
||||||
|
|
Aberystwyth, West Wales 3.9 kWp Ground Mounted PV array |
||||||
![]() |
Brightwalton, NorthWessex Downs AONB |
||||||
2009 |
|||||||
|
|
Tunbridge Wells, Kent In December 2009, a grid connected 2kWp roof mounted, solar electric array and a High Temperature Air Source Heat Pump was installed and commissioned by Ardenham Energy Ltd on an existing property in Tunbridge Wells in Kent. The installation was undertaken following the award of a Low Carbon Building Programme Grant. |
||||||
|
|
Tenterden, Kent In December 2009, a grid connected 2kWp roof mounted, solar electric array was installed and commissioned by Ardenham Energy Ltd on the roof of a farmhouse near Tenterden in Kent. The installation was undertaken following the award of a Low Carbon Building Programme Grant. |
||||||
|
|
Eaton Bray, Bedfordshire In October 2009, a grid connected 1.2 kWp roof mounted, solar electric array was installed and commissioned by Ardenham Energy Ltd on the roof of this residential property in Eaton Bray near Leighton Buzzard. |
||||||
|
|
Blewbury, Oxfordshire In September 2009, a grid connected 1.7 kWp roof mounted, solar electric and solar thermal array was installed and commissioned by Ardenham Energy Ltd on the roof of this residential property in Blewbury in Oxfordshire. |
||||||
|
|
Boars Hill, Oxford In October 2009, a grid connected 2.2 kWp roof mounted, solar electric and solar thermal array was installed and commissioned by Ardenham Energy Ltd on the roof of this residential property in Boars Hill in Oxford. |
||||||
|
|
Stoke Mandeville, Buckinghamshire In October 2009, a grid connected 2.04 kWp roof mounted, solar electric array was installed and commissioned by Ardenham Energy Ltd on the roof of this residential property in Stoke Mandeville, in Buckinghamshire. The installation was undertaken in 2 day following the award of a Low Carbon Building Programme Grant. |
||||||
|
|
Oswestry, Shropshire In October 2009, a grid connected 1.44 kWp roof mounted, solar electric array was installed and commissioned by Ardenham Energy Ltd on the roof of this residential property in Oswestry in Shropshire. |
||||||
|
|
Enstone, Oxfordshire 1.4 kWp Solar Electricity Array | Download the PDF In October 2009, a grid connected 1.44 kWp roof mounted, solar electric and solar thermal array was installed and commissioned by Ardenham Energy Ltd on the roof of this residential property in Enstone near Chipping Norton in Oxfordshire. |
||||||
|
|
Cuckfield, East Sussex In September 2009, a grid connected 2.5 kWp roof mounted, solar electric and solar thermal array was installed and commissioned by Ardenham Energy Ltd on the roof of this residential property in Cuckfield, East Sussex. The installation was undertaken following the award of a Low Carbon Building Programme Grant. |
||||||
|
|
Nuthampstead, Hertfordshire In September 2009, a grid connected 3.5 kWp roof mounted, solar electric array was installed and commissioned by Ardenham Energy Ltd on the roof of this residential property in Nuthampstead. |
||||||
|
|
Chalfont St Giles, Buckinghamshire In September 2009, a grid connected 2 kWp solar Electric roof mounted, solar electric array was installed and commissioned by Ardenham Energy Ltd on the roof of the residential property in Chalfont St Giles. |
||||||
|
|
Crowthorne, Berkshire In July 2009 Ardenham Energy installed and commissioned a 2 kWp system for Mr & Mrs Ray Vincent in Crowthorne, Berkshire. The electrical and mechanical installation was completed in 11 days after an onsite redesign of all proprietary systems. |
||||||
|
|
Wokingham, Berkshire In July 2009 Ardenham Energy installed and commissioned the 2 kWp system for Mr & Mrs Andrew Dean in Wokingham, Berkshire. The electrical and mechanical installation was completed in just over 2 days. |
||||||
|
|
Woolstone, Milton Keynes |
||||||
2008 |
|||||||
|
|
Pangbourne, Berkshire A 14 kW Air source heat pump was installed and commissioned in Autumn 2008 in a new build property in Pangbourne, Berkshire to building code level 3. The heat pump will provide space heating and domestic hot water for the whole property and alleviated the need for a gas supply to the property |
||||||
|
|
Steeple Claydon, Buckinghamshire |
||||||
|
|
Milton Keynes In June 2008 Ardenham Energy installed and commissioned a 2.58 kWp roof mounted grid tied PV |
||||||
|
|
Blewbury, Oxfordshire In spring 2008 Ardenham Energy installed and commissioned the 7 kWp ‘in roof’ system with the latest Sanyo panels on a barn conversion in Blewbury, Oxfordshire. |
||||||
2007 |
|||||||
![]() |
Stonor, Buckinghamshire near , Henley on Thames Download the PDF In spring 2007 Ardenham Energy installed and commissioned a 2 kWp PV and 2 collector solar thermal systems in a farmhouse in Stonor near Henley on Thames.
|
||||||
|
|
West London The grid connected roof mounted PV and Solar Hot Water array has been installed and commissioned by Ardenham Energy Ltd on a private residence overlooking the River Thames in London. |
||||||
|
|
Quainton, Buckinghamshire 2 kWp Solar PV array and Wind Turbine | Download the PDF |
||||||
|
|
Wembley 5kWp Solar PV array A grid connected 5 kWp solar PV array, comprising 2 arrays of 3.5 South East and 1.5 kWp South West was installed and commissioned in Summer 2007. Wembley Stadium can be seen in the background. |
||||||
|
|
Notting Hill Wind Turbine & Solar Thermal Array This well know turbine was installed (and subsequently taken down!!) along with a 3 collector solar thermal system which is still operational for the private residence of the future Prime Minister |
||||||
|
|
Heath & Reach, Bedfordshire A grid connected 1 kWp solar PV array, small scale 300 wind turbine and solar thermal hot water system have been installed and commissioned by Aylesbury based Ardenham Energy Ltd in Heath & Reach, South Bedfordshire. It is one of the first properties in the UK to include all 3 renewable technologies, and the first to source generation equipment from organisations with manufacturing facilities in the UK. |
||||||