Royal Mail Sorting Office, Chelmsford, Essex.
99 kWp Solar PV array

In July 2011, a 99 kWp grid connected solar PV array was installed and commissioned on the roof of the Royal Mail's sorting office in Chelmsford. To view the case study, click here.

 


Rampton


Rampton Hospital Learning Centre, Nottinghamshire.

12 kWp Solar PV array

In July 2010, a 12 kWp grid connected solar PV array was installed and commissioned on the roof of the newly built Mike Harris Learning and Development Centre at Rampton Hospital in Nottinghamshire. To view the case study, click here.



brightwalton_000


Newbury, Berkshire
Code Level 5 Property
PV and Solar Thermal

 

Croydon, Surrey
30 Solar Thermal and wind turbine systems

img_9595

Norwich, Norfolk
12 In Roof PV systems, New Build Houses

portland

West London
9 kWp Solar PV , New Build Luxury Houses

Bath
2 kWp Solar PV tiles , New Build School

pink_punters

Milton Keynes , Buckinghamshire
9 kWp Solar PV ,Recording Studio

luton_opt

Luton, Bedfordshire
12 kWp New Build Housing


014

East Grinstead, East Sussex
2 kWp PV and 600 W Turbine Site Services

IMG_2366compressed_001


Atherstone-On-Stour Industrial Estate, Stratford-upon-Avon
81kWp Solar Electricity Array | Download the PDF

The 81 kWp grid connected warehouse mounted solar electric PV array has been designed, installed and commissioned by Ardenham Energy. It is at the Atherstone Industrial Estate near Stratford upon Avon in Warwickshire and was installed in August 2009. The site which is to be used as a vegetable storage unit is located on the site of a former warehouse that was burned down in 2005; part of the planning requirement for the rebuild was a percentage of the sites electricity supply coming from a renewable energy source.

cara3

Lysander House, Cribbs Causeway
17.3 kWp Solar Electricity Array | Download the PDF

The grid connected roof mounted PV is being installed and commissioned by Ardenham Energy Ltd on the south facing roof of new build office development in Brstol. Once connected to the grid, the 17.3 kWp array will be almost silent in operation and will generate around 17000 kWh of greenhouse gas free electricity each year.

 

markham_opt


Markham Vale, Derbyshire, new build commercial units
24 kWp Solar Electricity Array | Download the PDF

The grid connected solar array systems were installed by Ardenham Energy Ltd on a new build factory/warehouse development as part of local authority planning requirements in Derbyshire. The 9 arrays are a combination of a 7 no 2.5 kWp and 2 n o 3 kwp arrays installed on 9 warehouses.

 

farnham

Farnham, New Build Industrial Unit
5 kWp Solar Electricity Array | Download the PDF

The grid connected solar arrays were installed and commissioned by Ardenham Energy Ltd on a new build factory/warehouse as part of local authority planning requirements. The photovoltaic arrays are in a combination of one 30 panel array split into two 15 panel arrays which provide electricity for the two units that it feeds.

 

developers_banner_03A


Denbigh Hall Estate, Derbyshire
14.5 kWp Solar Electricity Array | Download the PDF

The 14.5kWp grid connected system has been installed at the Denbigh Industrial Estate on a distribution centre by Ardenham Energy Ltd. The electricity generated is synchronised with the grid supply via an inverter and will be used to supply clean energy to the site. The energy can also be sold to the grid for use elsewhere when there is more energy produced than is needed in the site offices.