![]() |
Royal Mail Sorting Office, Chelmsford, Essex.
|
||
![]() |
|
||
|
|
Newbury, Berkshire Code Level 5 Property PV and Solar Thermal |
||
|
|
Croydon, Surrey |
||
|
|
Norwich, Norfolk |
||
|
|
West London |
||
|
Bath |
|||
|
|
Milton Keynes , Buckinghamshire |
||
|
|
Luton, Bedfordshire |
||
![]() |
East Grinstead, East Sussex |
||
|
|
Atherstone-On-Stour Industrial Estate, Stratford-upon-Avon |
||
![]() |
Lysander House, Cribbs Causeway The grid connected roof mounted PV is being installed and commissioned by Ardenham Energy Ltd on the south facing roof of new build office development in Brstol. Once connected to the grid, the 17.3 kWp array will be almost silent in operation and will generate around 17000 kWh of greenhouse gas free electricity each year.
|
||
|
|
Markham Vale, Derbyshire, new build commercial units The grid connected solar array systems were installed by Ardenham Energy Ltd on a new build factory/warehouse development as part of local authority planning requirements in Derbyshire. The 9 arrays are a combination of a 7 no 2.5 kWp and 2 n o 3 kwp arrays installed on 9 warehouses.
|
||
![]() |
Farnham, New Build Industrial Unit The grid connected solar arrays were installed and commissioned by Ardenham Energy Ltd on a new build factory/warehouse as part of local authority planning requirements. The photovoltaic arrays are in a combination of one 30 panel array split into two 15 panel arrays which provide electricity for the two units that it feeds.
|
||
|
|
Denbigh Hall Estate, Derbyshire The 14.5kWp grid connected system has been installed at the Denbigh Industrial Estate on a distribution centre by Ardenham Energy Ltd. The electricity generated is synchronised with the grid supply via an inverter and will be used to supply clean energy to the site. The energy can also be sold to the grid for use elsewhere when there is more energy produced than is needed in the site offices.
|














