Ardenham Energy Ltd
Ardenham Court
Oxford Road
Aylesbury
Bucks HP19 8HT |
Tel: 01296 331362
Fax: 01296 435747 |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
Developers PriceList
|
Technical Specification |
Price Information |
Return on Investment |
CO2 Saving |
Technology |
Footprint
|
Usable Free
Energy Yield
kWh/Yr |
Cost exc
VAT |
Cost per KG of Co2 saved per annum |
Annual Cost
Saving |
Annual
Value
of ROCs |
Annual
Return on investment |
Annual CO2
Saving (KG) |
Equivalent
return flight to |
Equivalent
to Driving (miles) |
3kWp Polycrystalline
|
12 m2 south facing |
2,550 |
£15,309 |
£11 |
£233 |
£221.62 |
3.0% |
1,450 |
Jeddah |
4,055 |
5kWp Polycrystalline |
20 m2 south facing |
4,250 |
£24,300 |
£10 |
£389 |
£369.36 |
3.1% |
2,414 |
Vancouver |
6,758 |
10kWp Polycrystaline |
40 m2 south facing |
8,500 |
£43,740 |
£9 |
£778 |
£738.72 |
3.5% |
5,680 |
Honolulu |
13,515 |
2.5 kW Ground mounted |
24 m2 |
3,500 |
£16,000 |
£11 |
£350 |
£332.50 |
4% |
1,505 |
Montreal |
4,605 |
6 kW Ground mounted |
24 m2 |
9,500 |
£24,000 |
£6 |
£950 |
£902.50 |
8% |
4,085 |
Honolulu |
12,500 |
25 kW Ground mounted |
24 m2 |
65,000 |
£70,000 |
£3 |
£6,500 |
£6,175.00 |
18% |
27,950 |
Auckalnd |
85,527 |
2 Collector Flat Plate |
4 m2 south facing |
1400 |
£3,714 |
£16 |
£140 |
n/a |
4% |
233 |
Copenhagen |
713 |
3 Collector Flat Plate |
6 m2 south facing |
1800 |
£5,486 |
£16 |
£180 |
n/a |
3% |
350 |
Rome |
1,069 |
3 Collector Evacuated Tube |
4 m2 south facing |
2100 |
£4,916 |
£14 |
£210 |
n/a |
4% |
350 |
Rome |
1,069 |
6kW |
100m2 for ground loops |
7500% |
£8,000 |
£1,263 |
£618 |
n/a |
8% |
379 |
Seville |
1,160 |
8kW |
150m2 for ground loops |
50 to 75% |
£10,500 |
£1,728 |
£845 |
n/a |
8% |
518 |
St Petersburg |
1,586 |
10kW |
200m2 for ground loops |
50 to 75% |
£13,000 |
£2,192 |
£1,073 |
n/a |
8% |
657 |
Instanbul |
2,010 |
6kW |
2m2 external |
50 to 75% |
£6,500 |
£1,263 |
£618 |
n/a |
10% |
379 |
Seville |
1,160 |
8kW |
2m2 external |
50 to 75% |
£8,000 |
£1,728 |
£845 |
n/a |
11% |
518 |
St
Petersburg |
1,586 |
10kW |
2m2 external |
50 to 75% |
£9,000 |
£2,192 |
£1,073 |
n/a |
12% |
658 |
Instanbul |
2,013 |
6kW |
10m2 boiler room |
50 to 75% |
£8,000 |
£1,263 |
£618 |
n/a |
8% |
379 |
Seville |
1,160 |
8kW |
10m2 boiler room |
50 to 75% |
£10,000 |
£1,728 |
£845 |
n/a |
8% |
518 |
St
Petersburg |
1,586 |
10kW |
10m2 boiler room |
10000% |
£11,000 |
£2,192 |
£930 |
n/a |
8% |
658 |
Instanbul |
2,013 |
|
|
Notes:
Energy yields assume a good location for solar i.e. south facing with minimal obstruction,
and for wind, exposed area with no tall trees or buildings with an average or above UK wind speed (5m/s).
Annual cost saving is based on a typical residential electricity and gas prices. These may change in future,
and have not anticipated potential feed in tariffs which will significantly reduce payback on investment.
Depending on electricity supplier/purchaser any electricity produced over 500 kWh PA may be eligible for a Renewable Obligation Certificate (ROC). This is valued at around £46 for every 1000 kWh produced (rounded up from 501 kWh).
Bespoke solutions incorporating solar roof tiles and in roof systems can be provided. The prices here do not provide this.
Carbon saving figures based on standard car achieving 35mpg.
COMMERCIAL
Ardenham Energy can provide solutions for new and existing build commercial projects.
New build projects are VAT exempt whereas existing projects would be subject to 17.5% VAT.
Due to potential for larger work scope and installation efficiencies the prices quoted may be
less than outlined for the domestic sector.
ROCs are based on March 2009 levels.
|